• FEATURED
    • BC
    • ALBERTA
    • -
    • MIDRISE
    • COMMERCIAL
    • TOWNHOUSES
    • COMMUNITY
    • PLANNING
    • ABOUT
    • SERVICES
    • PROCESS
    • TEAM
    • CAREERS
  • NEWS
  • CONTACT
Menu

Gravity Architecture

  • PROJECTS
    • FEATURED
    • BC
    • ALBERTA
    • -
    • MIDRISE
    • COMMERCIAL
    • TOWNHOUSES
    • COMMUNITY
    • PLANNING
  • STUDIO
    • ABOUT
    • SERVICES
    • PROCESS
    • TEAM
    • CAREERS
  • NEWS
  • CONTACT

Gravity News

​We try to keep our followers up to date on all things Gravity Architecture. Thanks for your interest!

Subscribe

Sign up with your email address to receive news and updates.

We respect your privacy and will only use your contact information to send you email updates.

Thank you from the team at Gravity!


Featured Projects

Featured
Langley Mixed Use
Langley Mixed Use
The Nines
The Nines
West Kelowna Towns
West Kelowna Towns
Badke Road Multi
Badke Road Multi
Shaganappi Multi
Shaganappi Multi
Bowness Multi
Bowness Multi
Quantumplace 1212
Quantumplace 1212
Mission Flats
Mission Flats
University Towns (Block 11)
University Towns (Block 11)

Instagram Posts

This week our Principals visited Logel's Seton West Phase 2 site! Since the development permit was issued in April, the project has made significant progress. Once completed, this three-building multi-residential development will provide 238 homes Ca
Mount Pleasant 8 is an eight-unit missing middle in the Mount Pleasant community in northwest Calgary. It was commissioned by RNDSQR and completed in 2017.⁠
⁠
This was an early implementation of missing housing in Calgary. At the time, the land use d
With over 15 years of experience in bookkeeping, Jayelene brings to Gravity her hard-working mindset and passion for numbers. Since 2012, she has been an integral part of the team, originally just doing our books, but over time growing into managing
Exciting news! Gravity is pleased to be partnering with the University of Calgary to produce a Design Studio investigating Single Stair housing, also known as Point Access Block (PAB) Housing. Through SAPL’s Workplace Integrated Learning progra
A&T Development's Red Fox Lodge is now complete! The building stands beautifully amidst the autumn leaves in the Sun Peaks Resort, near Kamloops, BC. This four-storey, 58-unit building will allow the resort to attract skilled and in demand staff

DP Released for Avalon's Net Zero Mixed Use!

August 06, 2024 in Calgary, Permit

The Development Permit has been released for Avalon’s Net Zero Mixed Use building!

This mixed-use five-story building will feature 56 apartment units, ranging from 550 to 1250 square feet, available in one and two-bedroom configurations. It will also house Avalon’s new headquarters, several other commercial units, and provide an underground parkade.

What makes this project so exciting is that it is part of a larger Avalon development that includes Avalon's Seton Townhome project. All the buildings on this site will incorporate Net Zero initiatives. Further, the townhomes will be prefabricated to quickly meet the area's housing demand ensuring the construction process moves as efficiently as possible.

We initially explored a mass-timber approach to the structure of this building. This structure would have provided more open, flexible office spaces on the lower levels, yet allow the more compartmentalized one and two-bedroom units on the upper floors. During this exploration, we drew inspiration from the natural hierarchy of a tree—from trunk to branch to twig—to guide our design. Although we eventually decided against using mass timber due to the lower fire resistance requirements for this building size, the concept of a tree's natural hierarchy still influenced the final design, and is visible in the arrangement of balconies, windows, and material joints on the facade.

We are thrilled that this development permit release will now allow us to move forward with the construction phase. As the project progresses, we'll continue to share updates on this important project. Click the button below to learn more.

Learn more
Tags: Mixed Use, Calgary, Development Permit
← DP released for Avalon's Greystone Townhomes in Cochrane!Introducing Lion, Our New Vancouver-based Project Architect! →
Back to Top

email: gravity@gravityarchitecture.com
Vancouver: 236-757-7216
Calgary: 403-464-7721